DRILLING RAPIDLY ADVANCING AT MAKUUTU RARE EARTHS PROJECT
- 3,700 metre drilling program to further quantify full potential of the 26-kilometre- long Makuutu mineralisation corridor and will materially increase the size of the already substantial Mineral Resource Estimate
- 967 metres comprising 62 drill holes completed to date with two rigs operating
- First batch of drill core submitted for analysis with assays expected within 4weeks
- Scoping study progressing well in parallel to the drilling